22021 Brimfield Grade School Window Replacement

The Scope of the Project is defined by the Contract Documents and generally consists of a window replacement including exterior doors and hardware associated with the existing window system being removed.
22021 D309 Brimfield Grade School Window Replacement Project Manual (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
2023-11-20 22021 D309 Brimfield OFB Project Manual 2.7 MB