24024 Morton CUSD 709 Weight Training Facility and Performing Arts Expansion
The scope of the Project is defined by the Contract Documents and generally consists of a 1 and 2-story building addition of a Weight Training Facility and Performing Arts Expansion with the selected demolition of an existing structure and renovation and expansion of an existing lobby. The building addition is a steel-framed super structure with drilled pier foundations. The exterior façade is an aluminum composite metal panel façade over metal stud sub-framing and CMU backup with aluminum curtain wall and entry systems. The roof is a single ply EPDM membrane roof. Interior finishes consist of CMU walls, drywall partitions, LVT flooring, rubber flooring, and polished concrete slabs.
Status
Bidding Closed
Prebid Date | 8/13/25 2:00pm |
Bid Date | 8/27/25 2:00pm |
Location
350 N. Illinois Avenue Morton, Illinois 61550