22020 Pekin 108 Junior High Phase 1 Renovation
The scope of the Project is defined by the Contract Documents and generally consists of a renovation to the existing buildings mechanical systems, restroom renovation, roof recovery, and ceiling replacement serving as the first phase of work to renovate the existing building. Work includes the demolition and replacement of existing ductwork, ceiling grid systems, data cabling, and lighting systems. As part of a mechanical renovation, a central plant system will be implemented with redundant boilers, air cooled chiller, and distribution piping for the system. The existing sprinkler system will be expanded into the ceiling replacement areas as well as adding secondary roof drain piping. SEVERAL SPECIFICATION SECTIONS ARE OMITTED FROM THE BID PROJECT MANAUL. THESE WILL BE ADDED VIA FUTURE ADDENDA.
Status
Bidding Closed
Prebid Date3/14/23 3:30pm
Bid Date4/4/23 2:00pm
Company & Contacts
Keach Architectural Design
Lee Gerrietts
(309) 263-4545
Location
Pekin, IL